The DOB reinstatement fees for old applications and expired permits will be changing
on March 21, 2011
Approved / Disapproved Applications: “More than one year, but less than two
years in approved or disapproved status with no relevant code / zoning changes and
no permits issued during this period.” Fee: A full filing fee as outlined in Table
28-112.2 of the NYC Administrative Code – SEE TABLE
28-112 2
First Permit Issued with No Work Started: “More than one year since issuance
of permit with no work started, but less than two years.” Fee: A full filing fee
as outlined in Table 28-112.2 – SEE TABLE 28-112 2
First Permit Issued with Work Partially Completed: “More than one year since
issuance of permit with work partially completed, but less than two years.” Fee:
$100.00 renewal fee & a percentage of the full filing fee –
SEE TABLE 28-112 2
Last Permit Has Expired, but Work has been Completed is Awaiting DOB Inspections
for Signoff Fee: No reinstatement fee required. Permit Renewal- $100.00
for each work type – SEE TABLE 28-112 2
Last Permit Has Expired, but Work has been Completed and No DOB Inspection is required
Fee: No reinstatement fee required
PLEASE NOTE: APPLICATIONS AND EXPIRED PERMITS OVER TWO YEARS
OLD CANNOT BE REINSTATED & MUST BE RE-FILED.
Click here for the full Department
of Buildings Notice
High Pressure Boiler Annual Inspections
The High Pressure Boiler inspection cycle begins November 16. The Department will
not be conducting high pressure boiler inspections in the upcoming cycle. Owners
must hire a qualified boiler inspector employed by an authorized insurance company
to perform the inspection.
More
DEP Asbestos Filing
Applicants must file the asbestos abatement ACP7 form to the A-TRU unit at the Department
of Environmental Protection. While the Buildings Department will no longer accept
the ACP7 after this date, applicants must continue to declare any asbestos work
on the PW1.